gas tax

West Bench pedestrian corridor


The West Bench pedestrian corridor was a joint project of the RDOS and the Province of BC completed in 2013.  Half the costs were covered by a grant from the Province and the remainder was covered by Area F gas tax funds.  Much of the path was undertaken coincidentally with the West Bench water system upgrade.  This made sense since major repairs were required to the roads and right-of-way after the new water mains were installed.