My thinking is that the sewage sludge should be composted at the Campbell Mountain site. If this is where it is to go after it is treated, then look at the savings in trucking costs for the next hundred to two hundred years. I'm not sure if the food waste can be treated separately but we do have other sites where this could be done that are owned by RDOS. If both have to be done at the same site then lets look at the extra cost of doing the site at Campbell Mountain and factor in the trucking cost savings and not having to pay out a land lease for the next 100 years and more.