Blogs

Other signs on West Bench Hill Road

  • Posted on: 10 December 2015
  • By: Michael Brydon

Just a heads-up: crews will be working to install the West Bench sign at the bottom on West Bench Hill Road.  To work freely, they will have to remove all the signs that are currently spread across the highways right-of-way.  Once the West Bench sign is constructed and the area around it is landscaped with natural vegetation we will likely take it upon ourselves to keep the area clear of signs (they are not supposed to be in the highways right-of-way in any case).

December 2015 projects update

  • Posted on: 10 December 2015
  • By: Michael Brydon

It is perhaps not the best weather to be doing projects, but we have a lot on the go in Area 'F'.  Two major projects in process are:

  1. The Faulder water upgrade (see main thread)
  2. The West Bench water reservoir (see main thread and some photos of progress)

 

In addition Mark Woods, the RDOS Community Services Manager, sent me the following update:

1. Selby Park washroom

The septic system in Selby Park is installed, certified and permitting has been finalized with the government

A new water line has been installed from the curb to the washroom location

Pages